Pesco Online Bills

Peshawar Electric Supply Company

  • Home
  • CUSTOMER SERVICES
    • Apply For New Connection Online
      • New Connection Online
      • NEW CONNECTION PROCEDURE
    • Net Metering
      • Net Metering Apply Online
    • A Life Line Consumer
    • Online Citizen Portal
    • How to get Pesco Bill by SMS or Email
    • Register Complaint Online
      • Customer Complaint Management System (CCMS)
  • Employee’s Corner
    • Download Documents
  • BILLS
    • TESCO ONLINE BILL
    • QESCO ONLINE BILL
    • IESCO ONLILNE BILL
    • SEPCO ONLINE BILL
    • HESCO ONLINE BILL
    • FESCO ONLINE BILL
    • MEPCO ONLINE BILL
    • GEPCO ONLINE BILL
    • AJK ELECTRICITY ONLINE BILL CHECK
  • Tarif Guide
    • Tariff Rates 2023-PESCO
  • PRIVACY POLICY
  • TERMS OF USE
  • ABOUT US
  • Blog

Power Shutdown : Up Date Alert

September 4, 2021 by pescobill Leave a Comment

The light will be remains off in the followning areas from  4,5 and 11 September 2021. A public message from Pesco.

Filed Under: Uncategorized

Load Shedding Schedule

September 1, 2021 by pescobill Leave a Comment

Online Load Shedding Schedule

Pescobill.net provide the consumers the latest update about all the load shedding schedule. You can easily check load shedding schedule with your reference number. Just follow the link and enter your 14-digit number in the box and there will be all about your required information.

Click the given link Below and Follow The Steps to check out the load shedding schedule.

⇒Load Shedding Schedule

When the welcome to Roshan Pakistan Portal is opened then follow as shown in details below.

     1.Load Management:

Click on the load management icon as shown in picture.

       2.  Enter Your Reference Number:

Now enter your 14-digits reference number in the box as shown in pic 2 and then press enter button to continue.

 

3. Feeder Status:

When you will enter your reference number then pressing enter button you will find the following screen that will show you the following things

The name of your feeder and its number and for the most and necessary the status of your feeder that pointed out with number 4 will tell you, is your feeder is on or off.

 

4. Details:

In this picture you will see the all required information about load shedding as shown in the pic below. The of AM and PM. Load shedding schedule

of tomorrow, today and yesterday with hourly basis.

It is a simple way to find out what the load shedding schedule of electricity in your area so you can manage your planning as according to the load shedding schedule.

 

Filed Under: Consumer Service Manual

Consumer Service Manual

August 14, 2021 by pescobill Leave a Comment

Consumer Service Manual

THE AIMS AND OBJECTIVE OF CONSUMER SERVICE MANUAL

Following are the main aims and objective of the consumer service manual. To make sure that a consumer which is going to avail the electricity facility must be aware of the duties and liabilities imposed on him on the behalf of company and toward the company.  The Consumer Service Manual lays down the instructions in pursuance of Section 21 (d) of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997
read with Rule 9 of the NEPRA Licensing (Distribution) Rules, 1999 which shall be administered by a distribution licensee, O&M Operator, Electric Power Supplier, Authorized Agent, as the case may be, to ensure safe, effective and reliable supply of electric power to consumers. Pursuant to sub rule 6 of the ibid rule the Authority may from time to time direct the licensee to revise the Consumer Service Manual in such manner and with
respect to such details as the Authority may direct, provided that the licensee shall not be required to revise Consumer Service Manual in a manner which may cause the licensee to be in breach of Laws or the applicable documents.

NECESSITY OF CONSUMER SERVICE MANUAL.

The Consumer Service Manual is applicable to all consumers served by the distribution licensee (DISCO to insert its name), O&M Operator, Electric Power Supplier, Authorized Agent, as the case may be, including the Bulk Power Consumers and includes, without limitation to the following matters, namely:

FORM AND HOW TO APPLY FOR CONNECTION.

Form and manner of application by the consumer for obtaining electric service connection, along with detail of documents to be submitted in support of the application.

FEE AND DN(DEMAND NOTICE) CHARGES.

Lees and charges for connection, installation of meters, other facilities for connection and reconnection.

METHOD TO INSTALL THE ELECTRICITY METER.

Procedure and manner for installation of meters and other facilities for connection.

TIME PERIOD FOR A CONNECTION.

Time frame for providing service connection to consumers. Procedure and manner for billing, time limit of payment of bills and procedure for
collection of bills.  Procedure for issuing disconnection notice to consumer for non-payment of bills and the procedure thereof for disconnection of electric supply in case of non-payment) and reconnection after payment of outstanding dues.Collection of arrears upon or following reconnection.
Procedure for disconnection and the charges for illegal abstraction/theft of electric power or for use of electric power for purposes other than those specified in he application for connection and service.

TO READ MORE ABOUT CONSUMER SERVICE MANUAL PLEASE DOWNLOAD IT FORM THE FOLLOWING LINK.

Consumer Service Manual2021

 

 

Filed Under: Consumer Service Manual Tagged With: Consumer Service Manual

Download Documents

July 28, 2021 by pescobill Leave a Comment

     WAPDA Employee’s Documents 

Employee are the back bone of a company and key to success. So company must take care of its employee and their families. Like all others companies WAPDA also took  initiative for the betterment of its employee and their families. After the retirement the employee become pensioners and avail the benefits provided by the company.  Here is a list of Documents which are necessary for the Employee of WAPDA. It is a comprehensive page where you can find any desire documents.

Documents for new appointed and also for the retired (pensioners).

  1. New Appointed Documents

  2. Pensioner’s Related Documents

  3. Miscellaneous  Documents

Fresh Appointed employees can download their related documents right here

New Appointed Documents

Description Link
Security ID Card Download
Police Verification Roll Download
Personal Data Form Download
Medical Registeration Form Download
Married Accommodation Form Download
Library Membership Form Download
Income & Assets Declaration Proforma Download
House Acquisition Forms Download
Hostel Accomodation Form Download
GP Fund Enrollment Form Download
GP Fund Advance Form Download
GLI Nomination Form Download
Free Elecricity Supply Form Download
Ehad Nama, Affidavit Download
Dress Code Download
Community Transport Facility Form Download
Charge Report Download
Acceptance of Terms & Conditions Form Download
Arrival Report Download
All the employees who served the company and now they need some documents for the pension procedure they can download their required documents form this table.

Pensioner’s Related Documents

Description Link
Undertaking-Refund Overpayment Download
Undertaking-Accommodation Vacation Download
Thumb & Finger Impression Download
Specimen Signatures Download
Pension Application Form Download
Option-Pension on Last Pay Drawn Download
Option-Cash Medical Allowance Download
Option- LPR or Encashment Download
Option for Pension Download
Option for Commutation Download
Non Receipt Gratuity Download
No Anticipatory Pension Download
Medical Registeration-Retired Download
ID Card-Retired Download
Free Supply-Retired Download
Final GPF Settlement Download
Family Members Download
Extra Ordinary Leave Download
Claim or reciept contribution Download
Certificate-Option One Car Download

There are some other employees like Gencos, here is list of some documents which are their requirement. So they can download them from list below.

Miscellaneous  Documents

Description Link
POSTPONEMENT OF DPE – SESSION MARCH 2021 Download
Man Power Data Form Download
Free Supply Form (Retired) Download
CM Water Form Download
Recruitement Form (BPS1 TO BPS 5) Download
EP Fund Declaration Download
Employee Children Qouta Application Form (BPS-01 to BPS-05) Download

 

Filed Under: Employee’s Corner

Net Metering : QESCO

July 27, 2021 by pescobill Leave a Comment

1. Net Metering

  1. Single Line Diagram Of On Grid Roof Top PV System for Net Metering Interconnection.

Single Line Diagram Of On Grid Roof Top PV System for Net Metering Interconnection

 

2. Single Line Diagram Of On Grid Roof Top PV System For Net Metering Interconnection Diesel Generator.

Single Line Diagram Of On Grid Roof Top PV System For Net Metering Interconnection Diesel Generator.

2. REGISTERATION OF APPLICATIONS

a. Application can   be   down   loaded   from   NEPRA’s   website www.nepra.org.pk & QESCO’s website www.qesco.gov.pk

b. Eligible Distributed Generator can submit application for net metering in the concerned QESCO office.

c. CAPACITY OF DIESEL GENERATOR FILICITY

3. REGISTERING OFFICE

  1. UPTO 70 kW                       Dy: MANAGER  OPER:
  2. UPTO 500 kW                     MANAGER OPERATION

ABOVE 500 kW                     CHIEF ENGINEER (P&E)

  1.  QESCO shall accord solar net metering approvals on a first come first served basis until the grid connected Solar PV installed capacity  reaches              30%  of  the  closest  upstream  Distribution Transformer rated capacity.

2.    The priority for such applications shall be maintained for which a separate register shall be prepared for solar roof top applications.

 

4. REQUIRED DOCUMENTS

  1. Distributed Generation Interconnection Agreement (Schedule-I).
  2. Standard Distributed Generation Application Form (Schedule-II).
  3. Application for grant of License (Schedule-III).
  4. Application for Exemption from section 24 of the Act (Schedule-IV).
  5. Fee Schedule (Schedule-V).
  6. Affidavit on non-judicial paper (Schedule-VI).
  7. Generation License Template (Schedule-VII).
  8. Attested copy of CNIC.
  9. Copy of last paid electricity bill.
  10. Certificate from Electric Inspector, Govt. of Balochistan.
  11. Technical Data of components including solar modules, Invertors,etc.
  12. Schematic drawings, Single line diagram of the system.
  13. Site plan showing location of external disconnect switch.

5. APPLICATION PROCESING

  1. Within five (5) working days of receiving an application QESCO shall acknowledge its receipt and inform the applicant whether the application is complete in all respects
  2. In case of any missing information or documents, the applicant shall provide the same to the QESCO office within seven (7) working days of being informed.
  3. The transformer shall be loaded (including proposed Checks before issuing the technical feasibility report of proposed The QESCO office shall perform an initial review / technical feasibility   to   determine   whether   the   applicant   qualifies   for interconnection facility,  or  may  qualify  subject  to  additional requirements provided that the initial review shall be completed within twenty (20) working days.: SRTPV system load) up to 80% of its capacity. Whether the  proposed  interconnection  will  require upgrading the capacity of existing distribution network. Phase  balancing  to  avoid  unbalancing  of  load  in secondary circuit of distribution line.
  4. In case the initial review reveals that the proposed facility is not technically feasible, QESCO office shall return the application and communicate reason (s) to the applicant within three (3) working days after the completion of initial review / technical feasibility study.
    1. Within seven (7) working days, QESCO Office shall forward the application along with agreement and enclosures to NEPRA for issuance of generation license. Simultaneously, QESCO office shall issue the demand notice to the applicant for the proposed interconnection facility.
    2. The applicant shall make the payment of demand notice within twenty (20) days of its issuance.
    3. QESCO office   shall   install   and   commission   the   proposed interconnection facility within thirty (30) days of the payment of demand notice by the applicant.
    4. Net Metering arrangement / billing shall commence upon grant of license to the Distributed Generator by NEPRA.
    5. agreement with the applicant within ten (10) working days.

 

6.TECHNICAL COMMITTEES   FOR   CHECKING/COMMISSIONING INTERCONNECTION FACILITY

  1. When application is entertained by Deputy Manager Operation
    1. Deputy Manager (Operation)                           Convener
    2. Deputy Manager (M&T)                                   Member
    3. Assistant Manager (Operation)                         Member

2. When application is entertained by Manager Operation Div:

    1. Manager (Operation)                                        Convener
    2. Deputy Manager (M&T)                                    Member
    3. Deputy Manager (Operation)                            Member

When  application   is   entertained  by   Chief QESCO HQ:

    1. Chief Engineer (P&E)                                         Convener
    2. Manager (GSO)                                                  Member
    3. Regional Manager (M&T)                                  Member
    4. Manager (Operation)                                         Member                                 

[Read more…]

Filed Under: Uncategorized

NEW CONNECTION PROCEDURE

July 23, 2021 by pescobill Leave a Comment

NEW CONNECTION PROCEDURE

QESCO has simplified the process of establishing new connections, especially for domestic and commercial subscribers. Application forms were also submitted in Urdu. The following documents are required for general contact of the application form.

  1. Copy of national identity card.
  2. A copy of the certificate of ownership. If the applicant is not the real owner, then the owner’s permission on stamped paper with proof of ownership is required.
  3. Abridged condition of supply duly signed by applicant

NEW CONNECTION PROCEDURE

The new connection procedure is defined by the following pictures. It is easy way to understand what kind of document are required for new connection and all kind of category

NEW CONNECTION PROCEDURE 1 NEW CONNECTION PROCEDURE 2 NEW CONNECTION PROCEDURE 3 NEW CONNECTION PROCEDURE 4

APPLY ONLINE FOR NEW CONNECTION

just click on the following link for apply on line

Apply Online Here

Filed Under: Uncategorized

QESCO Phone Directory

July 23, 2021 by pescobill Leave a Comment

From the pescobill.net platform we have introduced QESCO phone directory to help the costumers.

Here is complete phone directory of QESCO official. You can easily contact to the higher authority for any complain or any other information. Just search the required No. and dial it to contact the concern official. A complete telephonic directory is listed below to assist the costumers. QESCO phone directory is made to keep in touch the consumers to the high official of the company. From the following numbers you can register your complaint and report about theft of electricity.

QESCO Phone Directory

[table “4” not found /]

Filed Under: Uncategorized

Pakistan Citizen’s Portal

July 20, 2021 by pescobill Leave a Comment

What is Pakistan Citizen’s Portal?

The Prime Minister’s Performance Unit (PMDU) was created in 2013. To redefine a new vision of strengthening civic status and collective governance. Women, privileged persons and foreigners. The main goal of this unit is to give citizens the opportunity to freely communicate with all government agencies and resolve their issues as a matter of priority, in accordance with the government’s vision. This unit will establish a performance management culture and hold various government agencies accountable for their core functions and responsibilities. In addition, the unit will make recommendations to modify and simplify burdensome government procedures based on data from the database in order to ensure convenience for the public.

The division is committed to ensuring that citizens / members registered on the Citizens of Pakistan Portal (PCP) get the best possible comfort from their interactions with government agencies. Suggestions may be made to allow citizens / members to file personal complaints and grievances, report violations of the law, or seek public advice. The unit has an important responsibility to deal fairly with all complaints and suggestions. and effectively through relevant organizations. This directory portal is designed to help government agencies effectively address emerging issues. The processes described in this guide are available for understanding and use by all interested parties.

HOW YOU CAN USE PCP APP?

  1. First of all you need to download the PCP app on your cell phone.
  2. Now for complain you have to register yourself on Pakistan citizen’s Portal App with your CNIC and  obile Number.
  3. After registration you will get a verification SMS on your mobile.
  4. In the end now you can send your complaints and can take part in public polling.

Where To Find The PCP App?

You can easily find the Pakistan Citizen’s Portal App on the following platforms

 

Google Play

Dwonload

App Store

Download

Huawei App

Download

HOW TO USE PCP ON WEB BROWSER.

You can register your complaint by using citizen portal online. If you don’t have cell phone or android phone don’t worry here is a quick link for your to join PCP by just one click

Use PCP By using this link

Pakistan Citizen Portal Online 

Filed Under: Uncategorized

Alert About Changes In Pesco Bill

July 18, 2021 by pescobill Leave a Comment

All the consumer of PESCO and consumers of other companies are informs that GOVT of Pakistan has made new changes in the electricity bill.

The changes are following.

  1. NJ( Neelam Jehlam surcharge has exempted, so there is no more NJ surcharge in the Pesco electricity bill.
  2. The second change the GOVT has induced the INCOME TAX in the Pesco electricity bill on the domestic consumers. The criteria for the income tax on the consumer who consumes 1000 units per month and above.

So to avoid form income tax the consumers are advised to use less units.

Here is an example of income tax that has applied on Domestic consumer.

 

Filed Under: Uncategorized

Precaution During Rainy Season

July 15, 2021 by pescobill Leave a Comment

All Necessary precautions Should Be Taken During Monsoon Rains.

Water and electricity don’t go hand in hand! In fact, they are the worst enemies! Regardless of your job, the rainy season will definitely not protect you from getting wet. Well, there are many hazards when working with electricity during the rainy season. An electrical device charges the water tank with electrical ions, so if you want to step on that water, you’re sure to experience a severe electric shock! The rainy season also causes disruptions and damage to building wiring and even electrical receiving equipment. One little tip: disconnect all high voltage points in the building during thunderstorms and do not touch electrical contacts with bare hands during rain! Not only that, but there are many other things to do and do to cope with electricity during the rainy season, and this article will help you get to know all of them.

Rain and storm can pose a threat to electrical safety. Lightning and falling power lines and poles can cause injury or damage to life and property. PESCO advises its esteemed customers and the general public to always exercise caution to avoid electrical accidents during the rainy season by observing the following safety precautions:

Safety Tips During Rainy Season

  1. Avoid from fallen electricity poles and power lines or stayaway from anything in contact with these.
  2. Never lift up any low lying power lines.
  3. Don’t raise fallen or badly leaning electricity poles or support structures.
  4. Never jump over, go under, or touch broken or low hanging electricity power lines.
  5. Do not drive over fallen power lines.
  6.  Stay inside a car if it is in contact with a fallen power line and tell others to stay away from the car.
  7. If the car has caught fire, jump out of the car without contact with the car or any other metal part of the car.
  8.  Be careful not to touch water—or anything in contact with water—near where there is a downed power line.
  9. Prevent access to an area where there is a fallen electricity pole, or a broken or low hanging power line by putting warning signs to warn others of the immediate danger.
  10.  Never touch or come close to vandalized electricity equipment.
  11. Report all vandalized PESSCO equipment to PESSCO faults center or to the nearest PESSCO Offices.
  12. Do not climb any tree that is touching or is near to power lines.
  13.  Do try attempt to free somebody who is in contact with an electrical power line; but inform and alert the nearest PESSCO office, faults center and Police or Fire Brigade.
  14. Desist from doing any illegal electricity connections and extensions.
  15. Do not use electrical appliances that have been wet.

Filed Under: Uncategorized

  • « Previous Page
  • 1
  • …
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • Next Page »

ONLINE BILL CALCULATOR 2023

Calculate Your Pesco Bill By Units

WAPDA BILLS ONLINE

  • PESCO ONLINE BILL
  • GEPCO ONLINE BILL
  • MEPCO ONLINE BILL
  • FESCO ONLINE BILL
  • HESCO ONLINE BILL
  • IESCO ONLINE BILL
  • SEPCO ONLINE BILL
  • QESCO ONLINE BILL
  • TESCO ONLINE BILL
  • AJ&K ONLINE BILL

NEPRA Introduces New Surcharge Slabs for Late Electricity Bill Payments

Business Insurance

Business Insurance

Understanding Life Insurance: Types, Benefits, and Choosing the Right Policy

Top Insurance Companies in the USA

NEPRA Strikes Again with June’s FCA Power Hike! PESCO BILL

Nepra Approves Rs4.96/kWh Increase in National Average Power Tariff for FY2023-24

Comprehensive Guide to Choosing the Best Car Accident Lawyer: Your Path to Legal Success

What is a Mortgage: Types and How It Works

Increase in Base Tariff for Financial Year 2023-24

Increase in Base Tariff for Financial Year 2023-24

The Ultimate Guide to Choosing the Best Motorcycle Lawyer

Nepra Grants Permission for Rs1.61 per Unit Hike in Energy Prices

Nepra Grants Permission for Rs1.61 per Unit Hike in Energy Prices

Pay Scale Revised 2023.24

Recent Posts

  • NEPRA Introduces New Surcharge Slabs for Late Electricity Bill Payments
  • Business Insurance
  • Understanding Life Insurance: Types, Benefits, and Choosing the Right Policy
  • Top Insurance Companies in the USA
  • NEPRA Strikes Again with June’s FCA Power Hike! PESCO BILL

Home

Privacy Policy

Contact Us

Term Of Use

Disclaimer

ABOUT US

Pescobill.net is an unofficial site which is design for the consumers of Pesco(Peshawer Electric Supply Company). So that they can get duplicate bill easily print it and download their bill online

COMPLAINT CELL

Register Your Complaints

Reward For Theft Reporting

USEFUL lINKS

PESCO
FESCO
GEPCO
HESCO
SEPCO
IESCO
MEPCO
QESCO
TESCO

Copyright © 2025 . All Right Reserved To Pescobill.net