Pesco Online Bills

Peshawar Electric Supply Company

  • Home
  • CUSTOMER SERVICES
    • Apply For New Connection Online
      • New Connection Online
      • NEW CONNECTION PROCEDURE
    • Net Metering
      • Net Metering Apply Online
    • A Life Line Consumer
    • Online Citizen Portal
    • How to get Pesco Bill by SMS or Email
    • Register Complaint Online
      • Customer Complaint Management System (CCMS)
  • Employee’s Corner
    • Download Documents
  • BILLS
    • TESCO ONLINE BILL
    • QESCO ONLINE BILL
    • IESCO ONLILNE BILL
    • SEPCO ONLINE BILL
    • HESCO ONLINE BILL
    • FESCO ONLINE BILL
    • MEPCO ONLINE BILL
    • GEPCO ONLINE BILL
    • AJK ELECTRICITY ONLINE BILL CHECK
  • Tarif Guide
    • Tariff Rates 2023-PESCO
  • PRIVACY POLICY
  • TERMS OF USE
  • ABOUT US
  • Blog

Net Metering SOP

June 29, 2022 by pescobill Leave a Comment

How to Apply And Where To Apply For Net Metering?

Here is the complete guide for the consumers of Pesco, who wants to apply for the net metering. Please follow the instruction as given below with full details and procedure for the connection of net metering.

APPLICATION AND INTERCONNECTION PROCESS

The SOP for load above 25KW as approved by BoD PESCO in its 120th meeting Dated 30th Oct. 2017 as notified by Company secretary PESCO letter no 2228-29/ 120th BoD.  Dated 09/11/2017 shall be in vogue.

As purchase of Energy is involved, so all the cases must be monitored by the office of DG MIRAD PESCO. Cases of above 25KW sanctioned load, DG License from NEPRA shall be received and processed through the office of DG MIRAD PESCO.

Reference to Decision taken by Federal Cabinet in its meeting held on 31.08.21, NEPRA letter no.
DG(Licensing)/LAN-100/41048 dated 19.11.21, the consumers with sanctioned load below 25KW
were exempted from obtaining generation license from NEPRA regarding DG facility metering.

A revised activity flow chart for net-metering was issued vide circular # B/3/2/ACWA/19-PF dated: –
18/01/2022 by Ministry of Energy GoP. Based on these directions, a revised Net-metering SOP for PESCO is hereby proposed for approval please.

Reference to Decision taken by Federal Cabinet in its meeting held on 31.08.21, NEPRA letter no. DG(Licensing)/LAN-100/41048 dated 19.11.21 and direction of the PESCO Management to
expedite the net metering, the existing PESCO’s workflow for processing of Net Metering
applications from 5KW and above is proposed as under:

The Net-metering connections are hereby proposed to be allowed on those feeders having less than 50% ATC loss so as to avoid PESCO from further loss of the Imported Energy from the Net-
metering Consumers.

  1. REGISTRATION

1.1. Submission of Application form: (Processing Time = 2 Days)

PESCO offices shall receive Net-metering applications (up to 1MW) according to the existing

sanctioning powers as defined in NEPRA Consumer Service Manual-2021, on first come first serve
basis.

For connections on General Transformer, Net-metering connection be granted until the grid

connected solar roof top photovoltaic (SRTPV) installed capacity reaches 30% of the closest

upstream general distribution transformer rated capacity on the verification by Sanctioning officer.

1.2. Provide information and NEPRA approved documents:

Any applicant who meets the requirement of DG as defined in NEPRA (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015, submits their application along with all necessary documents to PESCO Sanctioning Office. Standard Application form is attached as Schedule-II.

1.3. Submission of application along with requisite documents in original: Following list of Documents are required to be submitted with application form:

 

S/No Document Status
1 Inspection of Electrical Installation Certificate Signed by authorized

Engineer of AEDB Certified Company as per direction of AEDB issued

vide letter No. B/3/1/Net Met/09 dated 13-02-2018

Mandatory
2 Site plan showing location of external disconnect switch. Mandatory
3 Schematic drawings, Single line diagram of the system. Mandatory
4 Technical Data of components including solar modules, invertors, etc. Mandatory
5 Copy of last paid electricity bill. (Name of applicant and name mentioned

on electricity bill must be same).

Mandatory
6 Attested copy of CNIC. Mandatory
7 Agreement form as per Schedule-I. Mandatory

 

8 Application form as per Schedule-II. Mandatory
9 Application for exemption from the requirement of section 24 of the Act

as specified in schedule-IV.

Mandatory
10 Ownership proof. Mandatory
11 Electric Inspector wiring test report (for above 25KW cases). Mandatory
12 Affidavit by Distributed generator as specified in Schedule-VI. Mandatory
13 Load flow study (for 25 KW and above If required). Mandatory
14 AEDB/ DG MIRAD PESCO attested copy of “DG Certificate” of installer

and vender.

Mandatory
15 Any other document. If required

1.4. Acknowledgement of application:

PESCO Sanctioning Office will acknowledge its receipt (with clear proper diary number and date) and inform the applicant whether the application is completed in all respect or not.

1.5. Incomplete application form: (Processing Time = 5 Days)

In case the application is found incomplete as per above check list, PESCO Sanctioning Office will
return the application and will ask the applicant to complete the application and re-submit it. The
applicant will have to re-submit the application in complete form to PESCO Sanctioning Office
within 2 Days.

For more and complete guide download the pdf manual with the given link  below.

Download Complete Guide

Filed Under: Net Metering

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ONLINE BILL CALCULATOR 2023

Calculate Your Pesco Bill By Units

WAPDA BILLS ONLINE

  • PESCO ONLINE BILL
  • GEPCO ONLINE BILL
  • MEPCO ONLINE BILL
  • FESCO ONLINE BILL
  • HESCO ONLINE BILL
  • IESCO ONLINE BILL
  • SEPCO ONLINE BILL
  • QESCO ONLINE BILL
  • TESCO ONLINE BILL
  • AJ&K ONLINE BILL

NEPRA Introduces New Surcharge Slabs for Late Electricity Bill Payments

Business Insurance

Business Insurance

Understanding Life Insurance: Types, Benefits, and Choosing the Right Policy

Top Insurance Companies in the USA

NEPRA Strikes Again with June’s FCA Power Hike! PESCO BILL

Nepra Approves Rs4.96/kWh Increase in National Average Power Tariff for FY2023-24

Comprehensive Guide to Choosing the Best Car Accident Lawyer: Your Path to Legal Success

What is a Mortgage: Types and How It Works

Increase in Base Tariff for Financial Year 2023-24

Increase in Base Tariff for Financial Year 2023-24

The Ultimate Guide to Choosing the Best Motorcycle Lawyer

Nepra Grants Permission for Rs1.61 per Unit Hike in Energy Prices

Nepra Grants Permission for Rs1.61 per Unit Hike in Energy Prices

Pay Scale Revised 2023.24

Recent Posts

  • NEPRA Introduces New Surcharge Slabs for Late Electricity Bill Payments
  • Business Insurance
  • Understanding Life Insurance: Types, Benefits, and Choosing the Right Policy
  • Top Insurance Companies in the USA
  • NEPRA Strikes Again with June’s FCA Power Hike! PESCO BILL

Home

Privacy Policy

Contact Us

Term Of Use

Disclaimer

ABOUT US

Pescobill.net is an unofficial site which is design for the consumers of Pesco(Peshawer Electric Supply Company). So that they can get duplicate bill easily print it and download their bill online

COMPLAINT CELL

Register Your Complaints

Reward For Theft Reporting

USEFUL lINKS

PESCO
FESCO
GEPCO
HESCO
SEPCO
IESCO
MEPCO
QESCO
TESCO

Copyright © 2025 . All Right Reserved To Pescobill.net